Tamleek Al Nahdi Safwat Al Salamah Project
6 Nov 2025

Safwat Al-Salama Project

60%OverallFirst visit — no previous comparison.

Main video

Engineering Report

Significant progress has been observed in the construction works of the Safwat Al-Salama project, with the building's concrete structure reaching the upper roof (annex) stage. External wall masonry using red bricks has commenced on the typical floors, while the roof walls have been completed using cement blocks.
Detected changes
Structural Framework100%

Completion of casting the columns and roof for the final floor and the upper annex

Masonry Works95%

Execution of red brick masonry for the front and side facades of the typical floors

Masonry Works (Roof)95%

Construction of the roof parapet and annex rooms using black cement blocks

General Site90%

Presence of excavation equipment (excavator) on the adjacent land and preparation of the site's perimeter fence

Progress reading

The images show that the project has significantly progressed beyond the core structural phase, with work currently focused on closing the exterior walls. The use of red clay bricks for the residential floors and cement blocks for the annex indicates adherence to the approved technical plans.

vs previous visit

No previous visit available for comparison

Expected next milestones

Commencement of external plastering works, initial electrical and plumbing installations, and the installation of metal window frames.

Progress

0%OverallAverage item progress
2/5 complete
Finishingnew
0%
Concrete Worksnew
0%
Electricalnew
0%
Mechanicalnew
0%
Foundationsnew
0%